Sketch 8C
|
Meter panel installation for use in conjunction with instrument transformer metering
|
Sketch 8D
|
Meter panel mounting arrangement for use with instrument transformer metering
|
Sketch 15
|
Instrument transformer and mounting for installation in instrument transformer cabinet underground. 3 wire, 1200A max
|
Sketch 15A
|
Instrument transformers and mounting for installation in instrument transformer cabinet underground service. 800A max
|
Sketch 16
|
Pad mounted metering and service termination cabinet up to eight 750 KCMIL conductors per phase. 2000A max.
|
Sketch 16A
|
Pad mounted metering and service termination cabinet up to twelve 750 KCMIL conductors per phase. 3200A max.
|
Sketch 20
|
Barriers for equipment installed in location with vehicular traffic
|
Sketch 23
|
Typical arrangement of instrument transformers in switchgear cubicle
|
Sketch 40
|
Typical arrangement of structural facilities installed by customer to accommodate underground service from a 3 phase pad-mounted transformer
|
Sketch 47
|
Customer wood pole
|
Sketch 49
|
Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors
|
Sketch 50
|
Termination compartment service entrance arrangements
|
Sketch 54A
|
Termination cabinet for 1 set of cable
|
Sketch 55
|
Clearances between gas facilities and electric meters
|
Sketch 55A
|
Clearances between objects and electric meters
|