Applies for applications on or after 9/1/23
Point of Common Coupling Requirements for Distribution Voltage Customer-Owned Facilities 12 kV Supply REV. 2, 9/1/2023 (.pdf)
This document specifies the relaying requirements necessary to accommodate large customer-owned DER, typically for system sizes 500 kW and greater. Relaying is required for larger DER systems to monitor performance during abnormal feeder conditions, and in some cases, disconnect the DER system to prevent an unintentional island from being sustained.
Relay and Control Requirements for Parallel Operation of Distributed Energy Resources REV. 2 , 03/01/2023 (.pdf)
This document provides guidelines for the interconnection of Energy Storage Systems in various configurations on the distribution system.
Energy Storage Policy and Guidance Document REV. 0 , 01/01/2023 (.pdf)
This document standardizes the SCADA interfaces between PPL Electric system operations and the DER protective relays and monitoring equipment, which are customer-owned and PPL Electric-controlled. The requirements stated in this document only apply when SCADA is required per the “Relay and Control Requirements For Parallel Operation Of Distributed Energy Resources REV. 2” document.
SCADA Requirements for Parallel Operation of Distributed Generation REV. 1 12/20/2023