Approved Meter Service Devices
PPL Electric UtilitiesMinimum Requirements for Self-Contained Service Point Enclosures
The following document defines PPL Electric’s minimum requirements for self-contained service point enclosures. This consolidates all previously established requirements into one comprehensive document. Moving towards minimum requirements in lieu of a traditional approved equipment list will better allow our customers to navigate complex and costly supply chain impacts within the industry and may also present equipment options not previously found on our approved list. This may also help customers avoid lengthy timelines typically associated with review and approval of new equipment.
REMSI Minimum Requirements for Self-Contained Service Point Enclosures – 3/5/2026 (.pdf)
Legacy Approval List - Index
The following table includes equipment previously approved for use within our service territory. Use of this equipment for new projects is permitted provided that it meets minimum requirements as set forth above and meets modern electrical code requirements. Contact your electrical inspector/equipment manufacturer directly if you have questions about this equipment meeting those requirements.
| TABLE # | SERVICE TYPE | ENTRANCE OVERHEAD (OH) / UNDERGROUND (UG) | AMPS | SOCKET TYPE |
| Table 1 Updated 4/14/2021 |
3 Wire Single Phase | OH | 100, 200, 400 | Single Position |
| Table 2 Updated 08/07/2019 |
3 Wire Single Phase | UG | 200, 400 | Single Position |
| Table 3 Updated 12/12/2017 |
4 Wire Polyphase | OH | 100, 200, 400 | Single Position |
| Table 4 Updated 12/12/2017 |
4 Wire Polyphase | UG | 200, 400 | Single Position |
| Table 5 Updated 08/15/2013 |
3 Wire Single Phase | OH & UG | 100, 200 | 2 to 6 Positions |
| Table 6 Updated 10/16/2019 |
4 Wire Polyphase | OH & UG | 200 | 2 to 6 Positions |
| Table 7 Updated 11/12/2012 |
3 Wire Single Phase | OH & UG | 100, 200 | 2 to 6 Positions / All In One |
| Table 8 Updated 2/26/2025 |
3 Wire Single Phase | OH & UG | 100, 200, 400 | Multiposition Gangable |
| Table 9 Updated 12/12/2017 |
4 Wire Polyphase | OH & UG | 100, 200, 400 | Multiposition Gangable |
| Table 10 Updated 09/09/2015 |
3 Wire Single Phase | UG | 200 | 1 or 2 Positions – Mobile Home Pedestals ONLY |
| Table 11 Updated 02/20/2020 |
3 Wire Single Phase | OH & UG | 100, 200, 400 | Single Position Meter Socket/Load Center |
| *Table 12 | 3 Wire Single Phase | OH & UG | 100 | Special Metering Applications |
| **Table 13 | 3 Wire Single Phase | OH & UG | 100 | Temporary Meter & Service Equipment For Construction |
* Special Metering Applications is a listing of specialized metering and service equipment used to serve other utilities and special municipal equipment. This table is not for general service use.
** Temporary Meter and Service Equipment is a listing of meter socket/load center combinations approved for temporary use for construction sites only. This table is not for permanent or mobile home service use.