Sketch 4A
|
Underground secondary service to underground attachment on temporary structure for construction
|
Sketch 7
|
Typical Arrangement of Meter on Building
|
Sketch 7A
|
Slip riser for installation on single phase underground services
|
Sketch 14A
|
Arrangement of instrument transformers and mounting for installation in instrument transformer cabinet
|
Sketch 17
|
Arrangement of outdoor meter panel on building for CT metering. Services over 600A
|
Sketch 18
|
Arrangement of Indoor Metering Equipment to Accommodate either Self-Contained or Secondary Instrument Transformer Metering
|
Sketch 20
|
Barriers for equipment installed in location with vehicular traffic
|
Sketch 25A
|
Secondary service meter base connections for self-contained meters underground service 200A.
|
Sketch 25B
|
Secondary service meter base connections for self-contained meters overhead or underground service. 400A
|
Sketch 26
|
Multi-meter installation using meter base with factory built-in bussing
|
Sketch 27
|
Metered traffic signal and unmetered streetlight
|
Sketch 28
|
Secondary Service multi-meter installation for common service with instrument transformer cabinets and/or meter bases
|
Sketch 43
|
Multi-meter installation for underground service lateral attachment for mobile home court
|
Sketch 45
|
Outdoor mobile home pedestal. Underground service lateral
|
Sketch 47
|
Customer wood pole
|
Sketch 49
|
Typical Connectors to be provided by the customer for serving a single point of connection for multiple enclosed service entrance conductors
|
Sketch 53 |
Typical arrangement of wood post pedestal. Underground service lateral from OH or UG distribution. Single phase, 3 wire, 120/208 or 120/240 volts |
Sketch 54A
|
Termination cabinet for 1 set of cable
|
Sketch 55
|
Clearances between gas facilities and electric meters
|
Sketch 55A
|
Clearances between objects and electric meters
|